MONOLITHIC SYSTEMS

MBCON offers a revolutionary aluminium formwork construction system which has been developed and successfully used around the world to form cast-in-place reinforced concrete structures.

Using our aluminium formwork solutions, all building components can be cast in a single operation, including:

Walls • Floor slabs • Columns & Beams • Stairs

Door and window openings are also incorporated. The resulting structure is extremely strong and highly accurate in its dimensions and achieves a high-quality surface finish with only minimum “skim coat” required for final surface finishing. MBCON System Formwork can dramatically increase the speed of construction with a 4-5 day per floor construction cycle average.

RAPID CYCLE TIMES

Using the MBCON system, our customers are able to dramatically increase the speed of construction with high-rise buildings constructed at a rate of 4-5 days per floor and landed properties constructed at a rate of one house per day using a single set of

INSTALL WALL STEEL

INSTALL WALL STEEL

INSTALL WALL STEEL

INSTALL WALL STEEL

INSTALL WALL STEEL

INSTALL WALL STEEL

By implementing daily work cycles, we achieve high productivity levels.

  • MBCON is designed for each project so the on-site construction process is simplified.
  • Semi-skilled or unskilled labour can be utlilised with training and coaching by MBCON supervisors.
    • Reduces the reliance on carpenters and bricklayers.
    • Substantial labour & material cost reduction.
  • Systematic approach allow fast construction times with excellent quality results.
  • Construction ccycle of 4 days per floor achievable.
    • Includes all walls, cores, stairs, balcony’s, architectural features, pre-installed MEP etc.

Typically 4 – 5 day per floor build cycles are achieved.

Double or single storey home build cycle of 1 house per day can be achieved.

HIGH REUSABILITY & 100% RECYCLABLE

MBCON aluminium formwork panels are designed for strength, endurance and can be re-used for multiple construction projects to maximise return on investment (ROI).

MBCON formwork panels are manufactured using high grade aluminium alloy. This material is 100% recyclable and can be sold at products end of life at high relative scrap values. By re-using MBCON Formwork you will substantially reduce future project formwork costs.

  • Panels can be re-used hundreds of times.
  • No timber or plywood consumable costs.
  • Stock panels can be integrated into new project designs.
  • Re-using stock formwork reduces the cost of future projects.
  • Maximises return on MBCON formwork investment.
  • 100% recyclable with high scrap value.

SYSTEM APPLICATION

MBCON Aluminium formwork can be utilised for a wide range of applications.

RESIDENTIAL

  • High-rise from mid-luxury developments to social and affordable housing projects.
  • Low-rise with multiple block clusters.
  • High-end landed housing and villa developments.
  • Town-houses.
  • Single or double-storey housing.

COMMERCIAL

  • High rise office buildings.
  • Hotels.
  • Mixed use developments (Office/Hotel/Residential).
  • Car parks.

Typically 4 – 5 day per floor build cycles are achieved.

Double or single storey home build cycle of 1 house per day can be achieved.